-
Notifications
You must be signed in to change notification settings - Fork 1.8k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[DPTP-4285] Wiped build11 for rebuild
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#60389
opened Jan 7, 2025 by
hector-vido
Loading…
Adding aro 4.18 tests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#60388
opened Jan 7, 2025 by
paigerube14
Loading…
CM-424: [o/cert-manager-operator] optional test: e2e-operator-tech-preview
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
OCPQE-21002 - Review 4.14 upgrade ci jobs and add missing jobs
#60384
opened Jan 7, 2025 by
dis016
Loading…
OpenStack: singlestackv6 Skip volume creation should create a manila share
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#60383
opened Jan 7, 2025 by
MiguelCarpio
Loading…
[WIP] ZTP Left shifting for the Telco QE KPI testing
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#60382
opened Jan 7, 2025 by
ccardenosa
Loading…
OpenStack: Update e2e-openstack-ovn-serial-techpreview timeout
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#60380
opened Jan 7, 2025 by
MiguelCarpio
Loading…
openshift/ci-tools: remove the cluster field on all jobs with capabilities
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#60378
opened Jan 7, 2025 by
droslean
Loading…
MGMT-19567: run tests post approval
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#60376
opened Jan 7, 2025 by
eifrach
Loading…
sriov: promote main branches to sriov-4.19
do-not-merge/invalid-owners-file
Indicates that a PR should not merge because it has an invalid OWNERS file in it.
#60371
opened Jan 7, 2025 by
zeeke
Loading…
Netpol-v2: Weekly job
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#60365
opened Jan 7, 2025 by
krishvoor
Loading…
update olmv0 capability checking
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#60364
opened Jan 7, 2025 by
jianzhangbjz
Loading…
Debugging OCP-48138 case on this profile
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#60362
opened Jan 7, 2025 by
melvinjoseph86
•
Draft
MULTIARCH-5196: x-px 4.19 is not using the correct installer
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#60361
opened Jan 7, 2025 by
pkenchap
Loading…
bump minor upgrade jobs for ovnk
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#60358
opened Jan 7, 2025 by
jluhrsen
Loading…
stackrox: test dev branch of k8srbac test timeout increase
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#60355
opened Jan 6, 2025 by
davdhacs
Loading…
enable HYPERSHIFT_AZURE_ASSIGN_SERVICE_PRINCIPAL_ROLES and remove skip-service-principal-deletion param
#60346
opened Jan 6, 2025 by
heliubj18
Loading…
telco5g: Remove retry attempts from tests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#60343
opened Jan 6, 2025 by
sshnaidm
Loading…
[WIP]: HCP IBMZ Multiversion Testing - 4.14, 4.15, 4.16, 4.17
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#60339
opened Jan 6, 2025 by
phani2898
Loading…
Previous Next
ProTip!
Type g p on any issue or pull request to go back to the pull request listing page.