You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The technical details of the current RP calculations are in this PR
Final excel should be labelled so we will need to perform a join at the end of the pipeline to add names from polygon table. Last time I checked - not all polygons were in the table, but this may have been fixed
Add baseline value to tabular stats
Decide on a way to treat null SFED values in DB
The text was updated successfully, but these errors were encountered:
The technical details of the current RP calculations are in this PR
polygon
table. Last time I checked - not all polygons were in the table, but this may have been fixedThe text was updated successfully, but these errors were encountered: